Electricians
Electrical leads from public permits, mapped to the trade that comes next.
New builds need rough-in, remodels move circuits, and a standby generator needs an electrician to hook it up. Electrical and EV-charger permits stay out of your feed, because an electrician already pulled them.
Why a permit is a electrical signal
We watch new-construction, remodel and generator permits as the cities publish them, classify them, and deliver them mapped to electricians. You're reaching the homeowner early — not buying a recycled form fill shared with five other pros.
Electrical permit signals by city
Recent electrical signals
Real permits from the latest feed in Los Angeles — house numbers masked; start a trial for the full addresses, newest permit 2026-11-21 there.
| Filed | Permit | Address | Adjacent signals |
|---|---|---|---|
| 2026-11-21 | remodel addition | ••• N ROSANNA ST | building materials supplierflooringcabinetryhvacelectrician |
| 2026-11-21 | remodel addition | ••• W SCOTT AVE | building materials supplierflooringcabinetryhvacelectrician |
| 2026-11-21 | remodel addition | ••• N VARNA AVE | building materials supplierflooringcabinetryhvacelectrician |
| 2026-11-20 | remodel addition | ••• W BRADDOCK DR | building materials supplierflooringcabinetryhvacelectrician |
| 2026-11-20 | remodel addition | ••• S SOMERSET DR | building materials supplierflooringcabinetryhvacelectrician |
Where the electrical signals are (each market's latest 30 days)
Electrical permit leads — FAQ
Where do electrical contractors get leads from building permits?
PermitVector watches new-construction, remodel and generator permits across its live markets every morning, classifies each permit, and delivers it mapped to electricians. That is about 9,529 electrical signals, each live market over its latest 30 days. Most permits reach you within a few days of issue, often before the adjacent trade has been hired, and there's no per-lead fee or shared-lead blast to buy into. Flat monthly pricing, $19.99 a month, with a 14-day free trial.
How many electrical permit signals does PermitVector track?
About 9,529 electrical signals across the live markets in Texas, Colorado, Florida, Arizona and California, each over its latest 30 days. Each is a public building permit, classified by trade and mapped to the adjacent buyer who should act on it.
How fresh are electrical permit leads?
The daily email arrives around 6 AM CT, and the dashboard and API update at the same time, carrying that morning’s pull. Each city’s own publishing delay still applies, so a electrical signal usually reaches you one to three days after the permit is issued. The City of Los Angeles publishes weekly and Hillsborough County runs about a week behind.
Pricing
Priced by county. No per-lead fees.
Start with a 14-day free trial. Card required, cancel in one click.
PermitVector
for one county, plus $9.99/mo for each additional county
2 counties $29.98/mo · 3 counties $39.97/mo · 5 counties $59.95/mo
Every trade, every permit, in the counties you choose.
Contact on your leads
Owner name and mailing address from the public record are included. Owner phone and email are sold by registered specialist providers, linked on every lead.
- ✓$19.99/mo includes one county; add more for $9.99/mo each
- ✓Every trade, and every live market inside the counties you pick
- ✓A daily email with the 25 best-fit leads per county, and the day’s full matches attached as a CSV
- ✓Search, dashboard and API for your counties, up to 20,000 API requests a day
- ✓State-license check on contractors in Texas, Florida, California and Arizona
- ✓Owner and contractor details exactly as the permit record publishes them
Contact details published in the permit record itself are included free.
The first one to the job site wins.
Turn your market's daily permits into your earliest, freshest pipeline. Start free and see your first feed tomorrow morning.
Card required · Free for 14 days · Cancel anytime.
Turn on your free 14-day feed.
Pick your counties and your trade and we'll set up your daily feed. Card required to start. Free for 14 days, cancel anytime. (The free permit lookup starts a 14-day feed without a card.)
No charge for 14 days. $19.99/month for one county plus $9.99/month for each additional county after that unless you cancel. We'll email a reminder 3 days before your first charge. Cancel anytime from any feed email or your billing portal, no fees and no contract.